Downer and Jonel Hydraulics had developed a Downer’s custom-engineered steel bridge launching nose, features a bespoke design controller and it was an element of a seven-bridge project. It was developed in partnership with Downer and Jonel Hydraulics to maximize the safety when launching bridge sections over the Ongarue River as part of a major KiwiRail infrastructure project.